Local News

1-19-15 first phase of agnesian expansion nearing completion

todayJanuary 18, 2015

The first phase of the Agnesian HealthCare Camelot Drive construction project is nearing completion. On Monday three Agnesian HealthCare services, podiatry, prthopedics and the Sports and Spine Center will move into the newly-expanded facility.   The Agnesian Health Shoppe will be located in the building just north of the clinic.   Once these services relocate, renovation will begin on some existing spaces and Agnesian HealthCare will prepare work areas to centralize pain medicine services,  and relocate physiatry services. This phase is expected to be complete by late March Optical shop and eye care services will relocate from the Division Street campus to the first floor of the Camelot Drive facility (facing the Highway 151 Bypass) in spring 2015.   During this time, the Agnesian Wound Clinic will relocate to its permanent location in the existing facility, which will make way for construction of a new prescription center (slated to open May 2015).  A second facility is under construction next to the 421 Camelot Drive facility. This 50,000-square-foot building will feature Agnesian dialysis, nephrology clinic, durable medical equipment and oxygen services. Completion is expected by March 2015.

Written by: Radio Plus

Post comments (0)

Leave a reply

Your email address will not be published. Required fields are marked *